| Design and Build: |
| Project Title |
Location |
Client / Owner |
| Design and Build of 208m Reinforced Concrete Chimney with 2 Internal Steel Liners, Mong Duong II CFPP 2 x 560MW |
Cam Pha Town, Vietnam |
Doosan Heavy Industries |
| Completion of Remaining Chimney Works for 180m Reinforced Concrete Chimney with 2 x 7.6m ID Steel Liners |
Rabigh, Saudi Arabia |
Civil & Electro Mechanical Construction Co. |
| Design and Build of 80m Chimney for SEPL BUGIS Project (New SRU7 Plant) |
Pulau Bukom, Singapore |
Chiyoda Singapore (Pte) Ltd |
| Design and Build of 100m Twin-Flued RC Stack, Merak 2 x 60MW CFPP |
Merak, Indonesia |
Daewoo Engineering Company |
| Design and Build of 100m Stack with 2 Internal 2.8m dia Liners |
Taganito, Philippines |
Formosa Heavy Industries Corporation |
| |
| Inspection, Repair & Maintenance: |
| Project Title |
Location |
Client / Owner |
| Repair of Chimney Skirt and Hopper - Yanbu |
Yanbu, Saudi Arabia |
Procurement and Contracts Department Power & Water Utility Company |
| Inspection of Unit 1 & 3 Boiler Stack Liner & Stage 1 Stack Liners External and Associated Fixtures |
Power Seraya , Singapore |
Power Seraya Ltd |
| Inspection of Unit 2 Boiler Stack Liner & Stage 1 Stack Liners External and Associated Fixtures |
Power Seraya , Singapore |
Power Seraya Ltd |
| Emission Study Works |
Pulau Bukom, Singapore |
Shell Eastern Petroleum Pte Ltd |