PROJECT REFERENCE


Intro
Testimonials
Our Clientele
Our Projects
  Current Projects
  Past Projects
Project List


 

OUR PROJECTS


Past Projects

Click here for Brief Details On Selected Projects

Zelan Construction
Shell Refining Company
Shell Eastern Petroleum Pte Ltd
Other Projects



Zelan Construction



BEC (M) successfully designs & builds two (2) 42m high 6000m3 Fly Ash storage silos


:: Completed Silos -Tanjung Bin Power Station, Johor, Malaysia (2004- 2005) ::
 
BEC (M) was appointed by Zelan Holdings (M) Sdn Bhd to design and build the 200m high 3-flue chimney for the 3 x 700MW Coal Fired Power Plant at Tanjung Bin, Johor, Malaysia.

CHIMNEY DATA
Height
:
200m
No. of internal steel flues
:
3
No. of internal platforms
:
3
Diameter of internal flues
:
7.5m
External concrete diameter
:
23m - 22.5m
Piles
:
60No. x 50m deep
Pile-cap
:
31.4m diameter x 2.5m deep
Email us at sales@be-con.com should you require a copy of the Project Report
 
Go to top


Shell Refining Company
   
:: Shell’s Pulau Bukom Refinery– currently Shell’s largest refinery in the world ::
 
In 2004 BEC (S) were awarded the contract to design and build a new 100m high 3-flue chimney for the existing and future Sulphur Recovery Units on Shell’s Pulau Bukom refinery.
 
CHIMNEY DATA
Height
:
100m
No. of internal steel flues
:
3
No. of internal platforms
:
3
Diameter of internal flues
:
1.05m
External concrete diameter
:
6.3m - 6m
Piles
:
24No. x 356x356x134kg/m
Pile-cap:
:
10.1m diameter x 2.0m deep
Email us at sales@be-con.com should you require a copy of the Project Report

Shell Refining Co. (FOM) Bhd. shutdowns . Port Dickson refinery

Stack: MVU, Plat 2, CD2, LRCCU
Successfully completed inspections and repairs to the above stacks during plant shutdowns. Emergency repairs required due to emergent works during inspection.
 
Go to top
 

Shell Eastern Petroleum Pte Ltd  
Shell Eastern Petroleum Pte. Ltd. shutdowns. Pulau Bukom refinery
Stacks: CD3, CD4, CD5, HCU, LRCCU, HCS, HCSII, TGU
Successfully completed inspection and repairs to the above stacks during plant shutdowns.
Works involved major and minor repairs to brick, steel and refractory linings.
 
Shell Eastern Petroleum Pte. Ltd. LOC/UTL shutdown
This project involves the design and construction of a steel liner. The liner is to be installed inside the existing windshield replacing the existing brick liner.
 
New design & build SRU Stack
BEC (S) successfully completes from feasibility studies through to conceptual design and final construction the new 100m high SRU stack servicing SRU units 3 & 5 and future SRU 6 unit.
 
Email us at sales@be-con.com should you require a copy of the Project Report
   
 
Go to top

 


OTHER PROJECTS

ALSTOM Power Asia Pacific Sdn Bhd.
Perlis Power Station Pipe Cleaning

Cleaned approx. 600m of gas supply pipeline using the rotor fan high-pressure water system.

Seraya Power Ltd.
Cleaning and inspection to chimney liners

This project involves the phased cleaning and inspection work to four (4) x 180 meter high steel liners. Ultrasonic testing, verticality readings and welding tests are involved to check the integrity of the existing liners.

Blue Circle Materials Silo alterations
Site managing the repairs and alterations on two 66m high bulk storage silos in Jurong Port.
Jump shutter construction of 30m skin walls in confined access storage cells. Void filling using pioneering high pressure pumping techniques. Site management team achieved very tight programme and partial completion dates.

 