OUR PROJECTS
Past Projects
Click here for Brief Details On Selected Projects
|
|
Zelan Construction |
BEC (M) successfully designs & builds two (2) 42m high 6000m3 Fly Ash storage silos
|
|
| :: Completed Silos -Tanjung Bin Power Station, Johor, Malaysia (2004- 2005) :: |
| |
| BEC (M) was appointed by Zelan Holdings (M) Sdn Bhd to design and build the 200m high 3-flue chimney for the 3 x 700MW Coal Fired Power Plant at Tanjung Bin, Johor, Malaysia.
|
 |
CHIMNEY DATA |
Height |
: |
200m |
No. of internal steel flues |
: |
3 |
No. of internal platforms |
: |
3 |
Diameter of internal flues |
: |
7.5m |
External concrete diameter |
: |
23m - 22.5m |
Piles |
: |
60No. x 50m deep |
Pile-cap |
: |
31.4m diameter x 2.5m deep |
| |
|
| |
|
|
|
|
|
|
Shell Refining Company |
| |
|
|
:: Shell’s Pulau Bukom Refinery– currently Shell’s largest refinery in the world ::
|
| |
| In 2004 BEC (S) were awarded the contract to design and build a new 100m high 3-flue chimney for the existing and future Sulphur Recovery Units on Shell’s Pulau Bukom refinery. |
| |
|
|
|
CHIMNEY DATA |
Height |
: |
100m |
No. of internal steel flues |
: |
3 |
No. of internal platforms |
: |
3 |
Diameter of internal flues |
: |
1.05m |
External concrete diameter |
: |
6.3m - 6m |
Piles |
: |
24No. x 356x356x134kg/m |
Pile-cap: |
: |
10.1m diameter x 2.0m deep |
|
|
|
|
 |
Shell Refining Co. (FOM) Bhd. shutdowns . Port Dickson refinery
Stack: MVU, Plat 2, CD2, LRCCU
Successfully completed inspections and repairs to the above stacks during plant shutdowns. Emergency repairs required due to emergent works during inspection. |
|
| |
|
|
| |
 |
Shell Eastern Petroleum Pte Ltd |
|
 |
Shell Eastern Petroleum Pte. Ltd. shutdowns. Pulau Bukom refinery
Stacks: CD3, CD4, CD5, HCU, LRCCU, HCS, HCSII, TGU
Successfully completed inspection and repairs to the above stacks during plant shutdowns.
Works involved major and minor repairs to brick, steel and refractory linings. |
| |
Shell Eastern Petroleum Pte. Ltd. LOC/UTL shutdown
This project involves the design and construction of a steel liner. The liner is to be installed inside the existing windshield replacing the existing brick liner. |
| |
New design & build SRU Stack
BEC (S) successfully completes from feasibility studies through to conceptual design and final construction the new 100m high SRU stack servicing SRU units 3 & 5 and future SRU 6 unit. |
| |
| Email us at sales@be-con.com should you require a copy of the Project Report |
|
| |
|
| |
|
|
| |
OTHER PROJECTS |
• |
ALSTOM Power Asia Pacific Sdn Bhd.
Perlis Power Station Pipe Cleaning Cleaned approx. 600m of gas supply pipeline using the rotor fan high-pressure water system.
|
• |
Seraya Power Ltd.
Cleaning and inspection to chimney liners This project involves the phased cleaning and inspection work to four (4) x 180 meter high steel liners. Ultrasonic testing, verticality readings and welding tests are involved to check the integrity of the existing liners.
|
• |
Blue Circle Materials Silo alterations Site managing the repairs and alterations on two 66m high bulk storage silos in Jurong Port.
Jump shutter construction of 30m skin walls in confined access storage cells. Void filling using pioneering high pressure pumping techniques. Site management team achieved very tight programme and partial completion dates.
|
| |
|
|
|
|
|