Heavy lifting equipment is used extensively in chimney, tank and silo construction.

Roofs, internal steel floors and internal steel liners can all be lifted using the hydraulically actuated heavy lift system.

Heavy lift jacks coupled with load equalizers are used in conjunction with blocking head and steel rope to attach objects and lift them to the desired level.
 

A 30 year old brick lined chimney is converted to a steel liner.

Sequence shows the installation of a 30 m long 4.1-4.3m diameter steel liner incorporating stainless steel cladding and aluminium encased insulation.


The top 11m of deteriorated concrete windshield is removed

An 800t crawler crane lowers the 70t section to the ground

The internal brick liner is removed & replaced with a new steel liner

The new steel liner is installed
BEC has experience using heavy lifting equipment in new build constructions, major repairs and demolition projects.

3x floor lifting inside chimney windshield
- view from ground level

Roof steelwork being lifted

Liner lifting - view from above
Lifting liner through
steel floors
   
Liner lifting