14 November 2006:
BEC expands into USA
BEC was awarded an ongoing design services contract for a Power Station expansion project in Texas, USA.

 

December 2005:
BEC achieves 400,000 man-hours without safety incident.

November 2005:
BEC awarded ISO 9001.
 
November 2004:
BEC Holdings Ltd. Incorporated
 
May 2002:
BEC Specialist Sdn Bhd. Incorporated
BEC Incorporates Malaysian Co.
 
January 2002:
BEC awarded CD4 shutdown project for Shell Eastern Petroleum Shutdown.
BEC goes from strength to strength as it is awarded another major shutdown project from Shell Eastern Petroleum. This project involves a major structural repair to a 100m stack on Pulau Bukom.
 
December 2001:
BEC awarded LOC/UTL shutdown project for Shell Eastern Petroleum Shutdown.
BEC has been awarded the contract for the proposed steel liner to the LOC/UTL chimney on Shell Eastern Petroleum's Pulau Bukom. This ambitious project requires the complete removal of the internal brick lining to the 100m stack, removal of the top 10m of reinforced concrete windshield and the installation of a steel liner all within a 25 day shutdown schedule.
 
June 2001:
BEC successfully completes Shell Eastern Petroleum Shutdown.
BEC's recently awarded contract with Shell Eastern Petroleum Pte. Ltd. was an unmitigated success. The project was awarded just weeks before the shutdown to a very tight programme schedule. BEC safely completed on time for the start-up of Shell's operations.
 
June 2000:
BEC established in Singapore.
 
 
 

 

 

 

 

 

 

 

 

DATE
AWARDED

CLIENT
PROJECT DESCRIPTION

18-May-07

Shell Eastern Petroleum Design and build a new 100m-high reinforced concrete multi-flue stack as part of the ECC expansion project at Shell's Pulau Ular refinery in Singapore.
8-Mar-07
Shell Eastern Petroleum Design and build a new 100m high reinforced concrete single-flue stack as part of the SBRM project at Shell's Pulau Bukom refinery in Singapore.
27-June-06
The Ratchaburi Electricity Generating Co., Ltd (RGCO) Major shutdown repair to Ratchaburi Power Station chimney in Thailand.

16-Mar-06

Senoko Power Ltd Inspection, Maintenance and Washing of Stage II and III Stacks and Its Concrete Windshields at Senoko Power Station.
4-Nov-05
Shell Eastern Petroleum CD3 fan scaffold.
2-Nov-05
McLarens (Thailand) Ltd Supervision to stack repair at Rachaburi Power Station.
28-Apr-05
NEA Tuas Incineration Plant

Inspection, cleaning and re-brick to stack

6-Mar-05
Shell Eastern Petroleum Repair to HCS stack (Replace brackets 3 & 4) plus brick supply order.
5-Mar-05
Shell Refining Company (Federation of Malaya) Berhad Consulting on damage to LRCCU stack.
4-Mar-05
Leighton Malaysia Inspection of 1 brick lined 200m high flue.
25-Jan-05
Shell Refining Company (Federation of Malaya) Berhad Inspection and repairs to 3 stacks (CD2/Plat 2/MVU).
25-Jan-05
Shell Eastern Petroleum HCS II Steel stack inspection access.
24-Jan-05
Shell Eastern Petroleum HCS repair check.
1-Aug-04
Shell Eastern Petroleum SRU emissions study.
28-Jul-04
Shell Eastern Petroleum Maintenance & repair to CD3.
26-Jul-04
Shell Eastern Petroleum New build SRU Stack.
16-Mar-04
Senoko Power Cleaning and inspection to 1 x180m high stack.
5-Mar-03
Singapore Refining Company CRU stack cleaning & painting.
18-Dec-03
Shell Eastern Petroleum LRCCU shutdown inspection work.
18-Dec-03
Shell Eastern Petroleum SRU feasibility study.
1-Dec-03
Shell Eastern Petroleum Maintenance & repair to CD5, Hydro, TGU stacks.
26-Nov-03
Singapore Refining Company CDU 2 stack inspection & repair.
14-Nov-03
Coca Cola Inspection to stack.
1-Nov-03
Nippon Express Demolition and disposal of 2No. Stacks at Jurong Power Station.
30-Oct-03
Singapore Refining Company Communication Tower cleaning and painting.
16-Oct-03
Oil Tanking Singapore Inspection to stack.
16-Oct-03
Oil Tanking Singapore Monthly maintenance to sprinkler system.
11-Sep-03
Caltex Singapore Inspection and repair to flare stack.
9-Sep-03
Singapore Refining Company Flare stack remedial works.
4-Sep-03
Shell Eastern Petroleum External inspection to CD3.
1-Jul-03
Singapore Refining Company HCU-2 chimney inspection.
20-Apr-03
Singapore Refining Company Sulphur Pit repair (701-F).
19-Feb-03
Power Seraya Cleaning & inspection of 9No. Steel liners.
6-Feb-03
Senoko Power Inspection to 8No. steam stacks.
25-Jan-03
RJ Crocker China building inspection and survey.
16-Jan-03
Lafarge Malayan Cement Stack inspection & testing.
13-Jan-03
Tuas Power Stack inspection.
5-Nov-02
Zelan Construction New design & build chimney: 200m high x 3 x 7.5m dia internal steel liners with Borosilicate glass block lining.
5-Nov-02
Zelan Construction 2No. X 6000m3 new design & build reinforced concrete silos.