about usservicesprojectssafetyreferencesnewscontact

BEC possess a wealth of experience in the inspection, maintenance, repair and demolition of chimneys, tanks and silos
.

We have experience managing the construction of over 100 stacks at locations throughout the world including Singapore, Malaysia, Taiwan, Indonesia, Hong Kong, Philippines, Thailand, Australia, the Netherlands and United Kingdom.

Details include single and multi-flue, refractory, brick, steel liners with C276 and titanium linings, structural steelwork floors, galleries, lateral restraints and all associated works (rack & pinion hoist, lightning protection, internal lighting, aircraft warning lights etc.) Heights up to 350 meters.

Extensive involvement in slip form and jump shutter projects throughout the world on structures such as high-rise buildings (over 50), silos (23), cryogenic tanks (9), sewage tanks and caissons (5), vent shaft linings (Channel Tunnel), water tanks (10) and telecommunication towers (Menara KL, Malaysia) Diameters up to 78 meters.
 

Zelan Construction
BEC (M) successfully designs & builds two (2) 42m high 6000m3 Fly Ash storage silos
For more details on the project
   

Zelan Construction
BEC (M) successfully designs & builds one (1) 200m high reinforced concrete multiflue chimney.
For more details on the project
 
Shell Refining Co. (FOM) Bhd. shutdowns. Port DIckson refinery
Stack: MVU, Plat 2, CD2, LRCCU
Successfully completed inspections and repairs to the above stacks during plant shutdowns. Emergency repairs required due to emergent works during inspection.
 
Shell Eastern Petroleum Pte. Ltd. shutdowns. Pulau Bukom refinery
Stacks: CD3, CD4, CD5, HCU, LRCCU, HCS, HCSII, TGU
Successfully completed inspection and repairs to the above stacks during plant shutdowns.
Works involved major and minor repairs to brick, steel and refractory linings.


Shell Eastern Petroleum Pte. Ltd. LOC/UTL shutdown
This project involves the design and construction of a steel liner. The liner is to be installed inside the existing windshield replacing the existing brick liner.

New design & build SRU Stack
BEC (S) successfully completes from feasibility studies through to conceptual design and final construction the new 100m high SRU stack servicing SRU units 3 & 5 and future SRU 6 unit.
For more details on the project
   
 
ALSTOM Power Asia Pacific Sdn Bhd.
Perlis Power Station Pipe Cleaning

Cleaned approx. 600m of gas supply pipeline using the rotor fan high-pressure water system.

Seraya Power Ltd.
Cleaning and inspection to chimney liners

This project involves the phased cleaning and inspection work to four (4) x 180 meter high steel liners.

Ultrasonic testing, verticality readings and welding tests are involved to check the integrity of the existing liners.
Blue Circle Materials Silo alterations
Site managing the repairs and alterations on two 66m high bulk storage silos in Jurong Port.

Jump shutter construction of 30m skin walls in confined access storage cells.

Void filling using pioneering high pressure pumping techniques. Site management team achieved very tight programme and partial completion dates.